GP-B Procedural Documents and Reports Archive
On this page:
- View the 2011 CQG Documents Contents Page
- View the Scientific & Technical Reports Archive Contents Page
Note: The files in this archive are stored in Adobe Acrobat PDF format (.pdf). To view them, you will need to have a copy of Adobe Acrobat—or the free Adobe Reader—installed on your computer. You can download/upgrade the free Adobe Reader from the Adobe website.
Caging
- P0050D: Assembly And In-Process Tests Of Science Mission Caging Units
- P0101: Caging Bellows Force Test GP-B Science Mission Procedure
- P0107B: Procedure For Polishing Caging Rod
- P0256: Caging Assembly And Test Readiness Review Completion Certificate
- P0325: Integration Of Caging Assemblies Into SIA
- P0424: Caging Spring Force Vs. Travel Test
- P0455: Flow-Thru Test Of Caging Lines
- P0460: Helium Check Of Probe Caging Line
- P0520: (Ptp) Low Temperature Test Of Caging Gyros In Probe C
- P0536B: Room-Temperature Test Of Caging System In Probe C
- P0553: Probe C Caging Valve Installation
- P0621: Gse Caging Ballast System Installation
- P0625: Gse Caging Commissioning
- P0628: (Ptp) Low Temperature Uncaging Gyros At Low Temperature Probe C
- P0763: Gse Caging And Spinup Buffer Line Installation
- P0927: Caging Line Closeout
Clean Room
- P0034: Clean Room Access Policy
- P0035: General Conduct Rules Within Gp-B Clean Room
- P0036: Approved And Restricted Materials And Actions
- P0037: Entry/Exit Procedures For Gp-B Hepl Clean Room Complex
- P0038: Clean Room Policy Review Procedure
- P0039: Procedure For Monitoring Airborne Particulate
- P0040: Clean Room Janitorial Procedure
- P0041: Clean Room Safety Course Outline
- P0042: Clean Room Course Outline
- P0045: Operation Of Liquid Particle Counter
- P0046: Contaminated Wipes Storage And Disposal For Hepl Clean Rooms 130, 132, Litho And Mgp
- P0047: Clean Room Utility Standards
- P0054: Leak Test Procedure Using The Varian 960 Leak Detector
Gyroscopes
- P0001: Procedure For Cleaning Gyroscope Housing
- P0002: Readout Surface Polishing And Etching Procedure
- P0003: Inspection Of Stanford Housing Blanks
- P0004: Inspection By Stanford After Cavitron Operations
- P0005: Etching And Reinspection By Stanford After Cavitron Operations
- P0006: Procedure To Clean Housings Prior To Al/Ti Deposition
- P0007: Tumble Lapping Gyro Housings
- P0008: Inspection By Stanford Of Tumble Lapped Housing
- P0009: Measurement Of The Gyroscope Housing Cavity
- P0010: Removal Of Al-Ti Coating And Inspection Of R/O Surface
- P0011: Coating Of R/O Surface With K-10 Epoxy By Stanford
- P0012: Inspection By Stanford Of Finished Quartz Housing
- P0013: Etching And Reinspection By Stanford Of Finished Quartz Housing
- P0014: General Inspection Of Housings
- P0015: Procedure For Spot Etching Of Quartz Housing To Relieve Strain Around Drilled Holes
- P0016: Fast Cleaning Procedure For The Inspection Of Quartz Housings
- P0017B: Removal Of K-10 Epoxy Resin
- P0018: Inspection Of Protective Coatings Of R/O Surface (K-10, Al-Ti)
- P0020: Housing Numbering
- P0021: Housing Dimensions Check
- P0022: Packing And Shipping
- P0024: Removal Of K-10A Epoxy Resin
- P0025: Rotor Coating Wet Bench Operating Procedure
- P0044: Development Quartz Housing Film Deposition Methods
- P0056: Automated Betascope Rotor Uniformity Measurements
- P0062: Procedure For Sulfuric Acid Boil To Remove Organic Contaminants From Fused Quartz
- P0063: Procedure For Thermal Cycling In Liquid Nitrogen
- P0064: Spinup Plumbing Assembly Procedure
- P0074: Lapping Procedure For Gp-B Rotors
- P0075B: Polishing Procedure For Quartz Rotors
- P0076B: Measurig The Rotor Diameter
- P0077B: Sphericity Measurements Procedure For Gp-B Rotors
- P0078B: Rotor Handling And Documentation Procedures
- P0079: Protocol For Rotor Coating In The Mrc Sputtering System
- P0085: Gyroscope Hardware Assembly
- P0086: Uv And Opitcal Readout Hardware And Cable Assy
- P0087: Suspension And Grounding Wire Assembly
- P0091: Gyro Retainer Assembly Procedure
- P0105: Gravity Probe B Gyro Housing Lithography Process 4/93
- P0114: Deposition \Of The Niobium Loop Player On Dev. Qtz Hsng
- P0123: Ground Cable Assembly
- P0175B: Integration Of Gyros Assemblies Into The Quartz Block
- P0178B: Room Temperature Tests (Integrated)
- P0203D: Uv Charge Control Commissioning Procedure For Sm Gyroscope
- P0204B: Procedure For Installation Ofsm Gyroscopes In The Low Temperature Commissioning Probe
- P0206: Measurement Of Gyro Alignment Relative To The Quartz Block
- P0255: Science Gyroscope Assembly Test Readiness Review Completion Certificate
- P0272B: Room Temperature Sm Gyroscope Commissioning Tests
- P0273B: Gyroscope Commissioning Probe Insertion Procedure
- P0274C: Procedure For Verification Of Dccoupling Of Sm Gyroscopes
- P0275B: Low Temperature Sm Gyroscope Commissioning Tests
- P0276C: Procedure For Flux Flushing The Gyroscope In The Gyroscope Commissioning Probe
- P0277B: Installation Of The Gyroscope Support Hardware For Thegyroscope Commissioning Probe
- P0278B: Procedure For Post Commission Handling And Storage Of Sm Gyrscopes
- P0279: Magnetic Screening Of The Sm Gyroscope In The Large Scale Magnetics Testing Facility
- P0281B: Procedure For Commissioning Gyroscopes For The Science Mission Probe
- P0297: Functionality Testof Thermometry And Heater For Sm Gyroscopes (Optional)
- P0298C: Additional Information On Gyroscope Geometry (Optional)
- P0299C: Procedure For Gyroscope Levitation With The Ddc Suspension System
- P0300B: Gowning Procedure For The Gyroscope Commissioning Probe Cleanroom
- P0304: Procedure For Stripping The Aluminum Cladding From The Fiber Opticcable
- P0305: Procedure For Gyroscope High Voltage To Ground Plane Breakdown Test
- P0306B: Procedure For Assembling Ultra Violet Fiber Optic Cable Assembly
- P0307B: Confirmation Of No Charging Of The Gyroscope During Levitation
- P0308B: Post Insertion Electrical Checklist
- P0310B: Low Temperature Gyro Spinup Procedure
- P0311C: Performance Testing Procedure (Optional)
- P0314B: Procedure To Determine Asymptotic Spin Speed For Science Mission Gyroscopes
- P0319: Spherical Substrate Cleaning System Procedure
- P0321B: Room Temperature Gyroscope Spin-Up
- P0326: Cable Assembly Suspension
- P0342: Functional Test Of Uv Source Eu
- P0370: Procedure For Installing Readout Cable To Gyroscope
- P0388: Exhaust Line Cleanliness Test
- P0426: Procedure To Measure R/O Loop Resistance
- P0431: Hook-Up And Check-Out Of All Gyro Cables With Probe Connectors
- P0435B: Verification Of Fiber Optic Light Transmission To Gyroscope
- P0481C: (Ptp) Levitation Of Gyroscopes In Probe C
- P0505: Pumping System And Gyro Spinup Operations For Rt Test In Probe C
- P0516B: (Ptp) Gyro Slow Spin Test
- P0519C: (Ptp) Gyro Flow And Thermal Testing
- P0522B: (Ptp) Gyro Fast Spin Speed Testing Procedure
- P0550C: Analysis And Summary Ofrtgyroscope Testing Results In Probe C
- P0565B: (Ptp) Uv Gyro Charge Control Checkout Procedudre
- P0626: Proton Detector (This Document Filed In Lmsc Archive- Signed Copy Requested 01/03/2000)
- P0632B: (Ptp) Prespinup Lt Checkout Of Gyroscopes In Probe C
- P0680: Inspection Of Fqh53 After Removal From Probe C
- P0681B: Removal Of Gyroscope From Sia
- P0747: Thermal/Vacuum Test Procedure For The Gyroscope Suspension System (Gss) Forward Suspension Unit (Fsu
- P0749B: Gyroscope Simulator Commissioning Procedure
- P0768B: Full Functional Test Procedure For The Gyroscope Suspension System (Gss) Aft Suspension Unit (Asu) S
- P0769B: Extended Functional Test Procedure For The Gyroscope Suspension System (Gss) Forward Suspension Unit
- P0829: Board-Level Test Procedure For Gyroscope Suspension System (Gss) Hv Amplifier And Bridge (Hva) Assem
- P0910B: (Ptp) End-To-End Charge Control Test
- P0925: Gyro Slow Spin Test In The Gaf Using The Gma
- P0933: Levitation Of Gyrosopes In Gyro Acceptance Probe (Gaf)
- P0934: Low Temperature Checkout Of Gyroscopes In Gyro Acceptance Probe
- P0977B: Open Gyro Gas Inlet Manual (Top Hat) Valves
- P0979B: Test Procedure For The Drag-Free Gyroscope Simulator (Dfgs) Software
- P1067C: Rt Works Spinup S/W Test Procedure
Miscellaneous
- P0080: Cryogenic Magnetic Screening Procedure
- P0084B: Bonding Index Plate To Spacer - Science Mission
- P0149B: Natural Orbital Environment Specification
- P0187: Cryo Dip Testing And Twe Testing Of Quartz Flight Windows 1, 2 And 3 Substrates
- P0191: Measurement Of Lead Shield Internal Dc Field
- P0192: Measurement Of Lead Shield Longitudinal Shielding Factor
- P0198D: Cleaning The Quartz Block
- P0201B: Fiberoptic Switch For Charge Control, Assembly Procedure
- P0202: Procedure For Cable Assembly,Ground
- P0262: Payload Magnetometer Test Readinesss Review Completion Certificate
- P0318: Sgs Procedure Database Feedback And Approval
- P0328: Installation And Connection Of The Ecu Hardware To The Flight Dewar And Probe B For Gtu-2 Testing
- P0335: Turning On The Engineering Unit Ecu During Gtu-2 Testing
- P0356B: Procedure For Epoxy Bonding Tra-Bond 2143D
- P0360: Removing The Sia From Probe-B: Gtu-2 "As Built" Procedure
- P0381: 70Khz Digital D.C. Suspension System Checkout And Release Procedure
- P0390: Probe Instrumentation Wiring Checkout
- P0399: Station 200 Thermal Test
- P0400B: Operations Manual For Qa Inspection And Flight Stores
- P0404: Transfer The Qb/T From Optical Table To Vertical Manipulator
- P0406B: Travel Sheet Guide
- P0411B: Test Procedure For I8, I9 Probe Wiring Verification
- P0414B: Procedure For Modification Of Connector
- P0419: Operations Manual For Precision Manipulator
- P0422: Gp-B Probe C/Gss Suspension Line Characteristics Measurement Procedure
- P0428: Check Out Suspension Cables
- P0429B: Pre-Integration Uv Fiber Optics Check-Out
- P0433: Hook-Up And Post Integration Instrumentation Checkout
- P0434B: (Ptp) Post Integration Check Out Of Suspension Cables
- P0443: Calibration Of The Seven Auto Collimator
- P0448: Metering Valve Disassembly
- P0457: Procedure For Supplementary Cmm Measurements For Quartz Block #3
- P0461: Repair Of Quartz Block #3
- P0462: Quartz Block No. 3 Zygo Measurement
- P0476: Esd/Eos Risk Mitigation Procedure
- P0482: Protocol Vibration Test 2.5 Vacuumvalve
- P0484C: Pre- And Post- Vibration Leak Test Procedure 2.5" And 6" Vacuum Valves (3179 And 3223)
- P0499: Probe Fastener Staking And Safety Wiring
- P0507: (Ptp) Measurement Of Top Hat To Top Plate Resistance
- P0508: Staking Of Uv Fiberoptic Cable Connectors In Probe C
- P0537: Porous Plug Characterization Test
- P0539B: (Ptp) Ecu Eu Installation Including Cables
- P0544: (Ptp) Ecu Test Support
- P0546: (Ptp) Quartz Block Temperature Controller Functional Test Procedure
- P0557: (Ptp) Install Gse Gas/Vac. Lines (+Z Axis Up)
- P0558C: (Ptp) Probe Pressure Measurement System Installation And Leak Check Procedure
- P0563: (Ptp) Procedure To Install Formed Payload Electronics Mounting Bracket
- P0567B: (Ptp) Probe Gas/Vac Gse Certification
- P0568: Verification Fdas Cable I-5 Probe Output
- P0569: Verification Daas Cable I-7 Probe Output
- P0571: (Ptp) Dewar Well Orbit Vent Assembly Installation Procedure
- P0578: Assembly Of Gas Flow Hardware In Sm Gma
- P0580B: 9(Ptp) 6" Vatterfly Valve Operation
- P0581: Assembly Of Connectors And Brackets To Gma Flight Solenoid Valves Prepared By D. Welsh)
- P0583: (Ptp) Ecu Bracket Removal And Exchange Procedure
- P0584: Fabrication Of Gma Wiring Harness-
- P0585B: Gma Assembly Leak Test
- P0586: Gma Acceptance Functional Test
- P0587: Gma Thermovac Test
- P0588: Gma Random Vibration Test
- P0589: (Ptp) Verification Fdas Cable I1 Probe Output
- P0596C: Board Level Test Procedure For Gss Abp Card, Pwa 8A01901
- P0597B: Board Level Test Procedure For Gsst Card, Pwa 8A01899
- P0598B: Board Level Test Procedure For Gss Acs Card, Pwa 8A01898
- P0599B: Board Level Test Procedure For Gss Acl Card, Pwa 8A01897
- P0600B: Board Level Test Procedure For Gss Atc Card, Pwa 8A01900
- P0601: Board Level Test Procedure For Gss Fbp Card, Pwa 8A01893
- P0602D: Board Level Test Procedure For Gss Fmr Card, Pwa 8A01892
- P0603B: Board Level Test Procedure For Gss Fcl Card, Pwa 8A01891
- P0604: Board Level Test Procedure For Gss Adda Card, Pwa 8A01886
- P0606: Board Level Test Procedure For Gss Arb Card, Pwa 8A01885
- P0607: Board Level Test Procedure For Gss Mux Card, Pwa 8101883Rev. C
- P0608: Board Level Test Procedure For Gss Lva Card, Pwa 8A01882
- P0611B: Tuning Procedure For Gss Mux Card, Pwa 8A01883
- P0612B: Gma Valve Controller Aceptance Test
- P0614: Programming Procedure For Amt Fpga, Pn 26220
- P0615: Programming Procedure For The Gss Fmr Card Pal Device (Pn 26221)
- P0630: Software Quality Assurance
- P0634: Proton Monitor Vibration Test Procedure
- P0635: Proton Monitor Thermal Vacuum Test Procedure
- P0636: Proton Monitor Functional Test Procedure
- P0638: Proton Monitor Inrush Current Test Procedure
- P0639: Proton Monitor Power Consumption Test Procedure
- P0640: Proton Monitor Transient Amplitude Test Procedure
- P0641: Proton Monitor Extreme Primary Voltage Test Procedure
- P0642: Proton Monitor Synchronization Test Procedure
- P0646: (Ptp) Connect V3 To Spinup Exhaust Gse (-Y Axis Up)
- P0647B: (Ptp) Remove Probe Spinup Gas/Vac. Lines
- P0662B: Preliminary Testing Of The Gma
- P0663: Gss Gold System Qualification Procedure
- P0665: Removal Of 2.5 Or 6 Inch Vatterfly Valves
- P0666C: Tuning Procedure For Acs Card, 8A01898
- P0667: Upgrade Gma Wiring Harness To Rev A
- P0668: Procedure For Supplementary Cmm Measurements For Quartz Block #5
- P0670: Gss Board Test Software Operational Procedure
- P0678B: Installation Of Electrical Component To The Gma Pallet
- P0679C: Measurement Of Gma Solenoid Valves For Readjustment
- P0686B: Readjustment And Reassembly Of Flight Gma Solenoid Valve
- P0687: Leak Test Investigation Of 2.5" Vatterfly Valves
- P0688: Gss High Voltage Capacitor Screening Procedure
- P0690: P9 Measurements
- P0692: Gss Aft Abbreviated Functional Test
- P0695: Gss Aft Full Functional Software Test Procedure
- P0696: Thermal/Vacuum Test Procedure For The Gyroscope Suspension System (Gss) Aft Suspension Unit (Asu)
- P0697: Programming Procedure For The Gss Arbiter Card (8A01885) Prom Device
- P0698B: Apu Post Rework Test Procedure
- P0699: Certification Procedure For The Gyroscope Suspension System (Gss) Thermal Vacuum Chamber
- P0701: Gss Joint Emi/Emc
- P0702C: Gss Performance Test
- P0705: Burn-In Procedure For The Gyroscope Suspension System (Gss) Aft Suspension Unit (Asu) Subsystem
- P0707: Gss Fsu Abbreviated Functional Test
- P0715: Functional Test Procedure For The Gyroscope Suspension System (Gss) Aft Computer Unit (Acu)
- P0716B: Pre-Assembly Component Matching Procedure For The Hva Pwa Optocouplers
- P0717: Replacing Sealing Plate In 2.5" Valve(A. Halvey)
- P0718: Replacing Bellow In 2.5" Valve (A. Halevy)
- P0723: Leak Check Of 2.5" Vatterfly Valves After Installation Of Vulcanized Butyl Seal Plates
- P0724: Removal Of Poppet Guides From Flight Gma Solenoid Valves
- P0725: Permeation Test Of 2.5" Vatterfly Valve After Installation Of Vulcanized Butyl Seal Plates
- P0728: Open/Close V2 Valve To Check The Current Consumption And Sensors Location
- P0731C: Thermovac Testing Of 2 .5" And 6" Vatterfly Valves
- P0733: Permeation Test 6" Valve
- P0735: Proto-Qual Vibration Test Procedure 2.5" And 6"Vacuum Valves (3179 And 3223) Retest Of Flight Spare
- P0737: Design Verification And Qualification Of New Poppet And Bushing On Gma Flight Solenoid Valves
- P0738: Gma Cleaning
- P0739: Proton Monitor: Final Checkout
- P0741B: Vatterfly Elastomer Life Cycle Test
- P0743: Gma Functional Health Test (Author: Dimitri Avaloff, Test Engineer)
- P0744: Leak Check Of Vatterfly Valves
- P0751: Gss Hva Relay In-Circuit Switching Performance Test
- P0752: Etp For Gss Asu-Eu With Flight-Spare Payload Processor
- P0758: Electrical Test Procecrure (Etp) For Gss Spaceccraft Emulator Gse
- P0759: Apu Power Unit Simulator Functional Test
- P0760B: Initial Power On Test Procedure For The Gss Apu/Acu Assembly
- P0761: Vibration/Leak Test Of 2.5 And 6 Inch Vatterfly Valve Spare Units
- P0762: Transfer Of Gma To Flight Mounting Plate
- P0772C: Full Functional Test Procedure For The Gss Aft Suspension Unit (Asu) Subsystem Using The Gss Test En
- P0786B: Certify Vacuum Module After Transport
- P0787B: Certify Uts After Transport
- P0792B: Prepare Payload Gse For Transport
- P0802B: Manufacturing Instructions Gss Forward Suspension Unit
- P0806: Checkout Of Gma Flight Wiring Harness
- P0807: Calibrating The Gmas Pressure Sensors And The Ecu Engineering Unit
- P0810: Space Network Andground Network Scheduling Procedures Users' Guide
- P0826E: Telemetry Data Processing In The Non-Real Time System
- P0827B: Displaying Apid 100 Telemetry Data In The Non-Real Time System
- P0828: Test Of Gma Spinup Assembly Pressure Sensor Calibration
- P0830: Command Timeout Reset Procedure
- P0832: Event Processing Returns
- P0836: (Ptp) Gss Temporary Installation Of Gp-B Payload Verification Test Bii Operations Order
- P0846: (Ptp) Magnetometer Temporary Installation Gp-B Payload Verification Test Ii Operations Order
- P0847: Electrical Test Procedure (Etp) Forecu Spacecraft Emulator Gse
- P0848: Software Operating Procedure For Lva Wiggle Operations
- P0849: Aft Gss Temporary Installation
- P0850: Aft Ecu Temporary Installation
- P0852: Payload Magnetometer Temporary Installation
- P0855: Discrepancy Reporting Instructions
- P0857: Gss Board Test System (Gold System) Gse Recertification Procedure
- P0858: Abbreviated Board-Level Test Procedure For The Gyroscope Suspension System (Gss) Analog Backup Contr
- P0878: Science Probe Gas Inlet Manifold Cleanliness Verification
- P0879: Accident/Incident/Mishap Notification Process
- P0880B: Gravity Probe B Standard Operating Procedure Gp-B Outbound Shipping Instructions
- P0881B: Verify Helium Cylinder Content/ Connect Helium Supply Line
- P0882: Moc Backup Generator Verification
- P0886B: Gds Operation Manual
- P0887: Ecu Truth Test
- P0888: Uv Cable Continuity Check
- P0890: Gp-B Vatterfly Valve Inspection 2.5 Inch And 6 Inch
- P0892: On Board A/D And D/A Converter Calibration Procedure For Gss Forward Suspension Units (Fsu)
- P0893: Gp-B Template Guidance
- P0897: Payload Magnetometer Tvac Procedure
- P0900B: Moc Rebuild Moc- Server From Moc-Crunch
- P0901: Moc Rebuild Science From Science-Crunch
- P0902B: Moc Replace Network Hardware With Spares
- P0904: Data Processing Through A Spacecraft Clock Reset
- P0905: Processing Data From A High-Resolution To An Averaged Data Set
- P0907: (Ptp) Mss 3.2.7 Functional Test Of The Non0Flight Gma
- P0908C: Mss To Tdp/Tcad Database Population Process
- P0909: Gas Mock Gma Acceptance Test Procedure
- P0911: Reprocessing High Resolution Data From The L0 Database
- P0912: Calibrating The G-Mock Pressure Sensors And The Ecu Engineeing Unit
- P0914: Evacuate And Backfill Vatterfly Valve Covers
- P0917C: Gds Acceptance Test Procedure
- P0920B: (Ptp) Mss 3.2.7 Functional Test Of The Flight Gma
- P0921B: (Ptp) 15.10 Gma Flow Test Including Vatterfly Valve & Heater Operrtations (Ps
- P0928: 0 Hz Spin Test/Add Exchange Gas In The Gaf Using The Gma
- P0930: Gmasleep Procedure
- P0931: Gma Latch Valve Internal Leakage Test
- P0936: Gss Aft Power Unit (Apu) And Aft Control Unit (Acu) Subsystem
- P0938: Low Pressure Voltage Breakdown Test Procedure For Gss Fsu Flight Spare Hva Board
- P0939: Itf Timing Test: Test Configuration And Version Control Documentation
- P0940: Gma Sleep Procedure
- P0941: Receiving The Flight Gma From Moog
- P0942C: Bleed Down Of The High Gma Pressure
- P0943: Verification Of Gma Outlet Flow Rates
- P0944: Shipment Of The Gma To Lockheed
- P0946: Connecting And Disconnecting The Flight Gma To The Ecu
- P0949D: Operational Procedure For Regression Testing Tdp
- P0950G: Operational Procedure For Regression Testing Tcad
- P0953B: Test Data Scp Procedure
- P0959: Gp-B Gss Acu Clock Frequency Test
- P0960C: Gds Operations Procedure (At Vafb)
- P0961: Internal Valve Leakaage Check Of The Flight Gma (At Vafb)
- P0962: Gma Sleep Procedure (At Vafb)
- P0964: Moc Ssb Software Users Guide
- P0968: Bleed Down Of The Gma High Pressure At Vafb
- P0970: Gma Preparation For E28 Testing
- P0973: Gma Vent Extension Service Procedure On The Mst
- P0974B: Gma Rate Of Pressurer Rise Test Procedure At Vafb
- P0981B: Automated Import Scripts Software Test Document
- P0982: On-Board A/D And D/A Converter Calibration Procedure For Gss Suspension Units (Fsu)Itf Engineering C
- P0983: Replacement Of Gma Fill And Drain Valve Snap Ring
- P0988: Vent Service Cart Acceptance Test Procedure
- P0989: Proof Testing Of Gse
- P0991E: Tqsm Operational Procedure For Baseline And Regression Testing
- P0993: Moc Switch From Pod D To Pod E
- P0996B: Database Backup Procedures For Science Network Databases
- P0999: Moc Passlog Procedure
- P1020: (Vandenberg) Certification Of Electrical Module, Gas Module, And Data Acquisition System
- P1021: Certification Of The Temperature Monitor And Alarm
- P1022: Certify Vacuum Module After Transport
- P1023: (Vandenberg) Certify Uts After Transport
- P1024: (Vandenberg) Prepare Payload Group Support Equipment For Transport
- P1025: (Vandenberg) Certify Pump Module After Transport
- P1049C: Joint Operating Procedure For Operations Conducted At Buildings 1605, 1610, And The Mst
- P1050: Measure Vatterfly Valve Leak Rate
- P1051B: Thrust Nullifier Heater Verification
- P1053: Window 4 Environment Control And Monitoring
- P1055: Configure Smd For Ecu Repair
- P1056: Close Gas Inlet Manual Valves (Top Hat)
- P1057: (Vandenberg) Gma Flow Test 15.10.1
- P1069: Spacecraft Battery Magnetic Field Survey
- P1070D: Recovery Of Science Database
- P1071B: Database Recovery Procedures For Science Netwok Database
- P1073: Sybase 12.5.0.3 Patch Test Procedure
- P1075B: (Ptp) Uv Cable To Aft Ecu Demate / Mate
- P1078: Operational Procedure For Baseline And Regression Testing Of Auto Import
- P1080: Gss Acu Payload Processor Removal Procedure
- P1083B: Gp-B Publicity And Publication Policy
- P1084B: Rescinded By Eco 1494 11/05/04 11/05/04Gp-B Policy For Science And Engineering Data Security
- P1085: Gp-B Data Release Procedure
- P1087: Sybase Database
Plans
- P0057: Gravity Probe B Magnetic Control Plan - Science Mission
- P0059: Probe C Contamination Control Plan
- P0098B: Science Mission Configuration Management Plan
- P0108C: Science Mission Quality Plan
- P0130: Fracture Control Plan
- P0145: Standard Materials And Processes Control Plan
- P0146: Science Mission Reliability Plan
- P0147: Gravity Probe B Relativity Mission Contamination Control Plan, Master
- P0327: Gravity Probe B Relativity Mission System Safety Program Plan
- P0363: Quartz Block No. 3 Transportation Plan
- P0403: Payload Transportation And Handling Plan
- P0956: Moc Functional Verification Of The Network Test Plan Procedures
- P1059: Space Vehicle Close-Out Photo Plan
SQUIDs
- P0102: Squid, Readout Cable Assembly
- P0110: Output Jumper Cable Assembly
- P0116B: Soldering Connector Onto Grt
- P0117: Squid Bracket Assembly And Squid Bracket Unit
- P0120: Heater Assembly
- P0152: Squid Carrier Substrate Fabrication
- P0153: Squid Carrier Assembly & Process Endurance Testing
- P0155: Output Transformer Fabrication Verification
- P0156B: Feedback Transformer Verification
- P0157: Use Of Epoxy Stycast 1266 Procedure
- P0158: Lead Gasket Fabrication
- P0159: Squid Package Assembly
- P0160C: Squid Package Testing And Verification
- P0161: Squid Capacitor Kit Assembly
- P0164: Squid Die Pre-Screening Procedure
- P0166: System Integration- Outline Of Integration Procedure For The "As Built" Gtu-2 Readout Hardware Into
- P0170: Readout Shake Test
- P0171: Squid Proton Test
- P0182: Soldering Connector To Heater
- P0183B: Procedure For Epoxing Readout Cable Clip And Short Carrier To Heater Assy And For Epoxing Grt To Eit
- P0257: Squid Kit/Readout Test Readiness Review
- P0329: Procedure For Gtu-2 Emc Tests
- P0331: Procedure For Gtu-2 Emi Tests
- P0415B: Squid Kit Installation Procedure
- P0498: Engineering Test Procedure For Non-Flight Unit For Payload Verification Revision C Squid Electronic
- P0510: (Ptp) Squid Functional And Pickup Loop Test
- P0538B: (Ptp) Fwd Sre Rev.C Installation
- P0623: (Ptp) Forward Sre Eingneeering Unit Reinstallation
- P0624: Engineering Test Procedure For Non-Flight Unit For Payload Verification Sre Flight Equivalent Unit (
- P0631: (Ptp) Sre Box Removal
- P0645: (Ptp) Fwd Rev. C Sre And Ecu Engineering Unit Removal
- P0682: Connect Input Cable To Squid
- P0726: Checkout Of Readout Loop Continuity In Probe C
- P0833E: Squid Readout Electronics (Sre) Usage In Payload Test Ii
- P0837: (Ptp) Fwd Sre Temporary Installation (Gp-B Payload Verification Test Ii Operations Order)
- P0839: (Ptp) Squid Bracket Id Procedure Using Gse
- P0843: Electrical Test Procedure (Etp) For Sre Spacecraft Emulator Gse
- P0845: Sre, Tre, Ecu And Gss Removal Procedure
- P0851: Aft Sre Temporary Installation
System
- P0133: (Ptp) Preparations For Probe/Airlock Integration
- P0134: (Ptp) Airlock/Dewar Integration (Available In Hard Copy Only)
- P0135: (Ptp) Probe Insertion Into Smd (Available In Hard Copy Only)
- P0140: (Ptp) Prepare Probe-C For Testing
- P0141: Fist Emergency Procedures
- P0176: Probe Preparations For Integration With Qb/T
- P0177: Sia Integration Into Probe
- P0205B: Mount Probe Onto Precision Manipulator Gp-B Science Mission Procedure
- P0207D: Main Tank Normal Boiling Point Fill
- P0209E: (Ptp) External Guard Tank Fill
- P0210E: Internal Main Tank To Well Transfer
- P0211E: Internal Guard Tank Fill- Guard Tank Vent Line Connected
- P0212C: Guard Tank Depletion
- P0213E: Connect Vacuum Module / Pump On Smd Vacuum Shell
- P0214D: Stop Pumping On Smd Vacuum Shell/ Disconnect Vacuum Module
- P0215B: (Ptp) Smd Pumpdown Of Main Tank
- P0216B: (Ptp) Smd Pressurization Of Main Tank From Subatmospheric To Normal Boiling Point
- P0217B: (Ptp) Smd Main Tank Subatmospheric Fill
- P0270C: Transferring The Quartz Block From The Roller Mechanism Cart To The X-Y Cart
- P0366: Transfer Probe From Pm To Gurney Plus Transportation
- P0371: Post Probe Removal From Sm Dewar
- P0376B: Remove Probe Vacuum Can Gp-B Science Mission Procedure
- P0409: Preparation And Transport Of Probe To Class 1000 Clean Room
- P0410: Attach Vacuum System And Leak Check Probe C
- P0412: Sia Integration Readiness Review
- P0420: Re-Install Probe Vacuum Can
- P0438: Probe Transport To Fist-Ops
- P0441C: (Ptp) Smd Fill With Main Tank Precool
- P0442E: Smd Fill With Guard Tank Precool- Main Tank At Nbp
- P0483: Probe C Assembly/Sm Integration (And Test) Readiness Review (Trr)
- P0496: Probe Closure And Functional Testing I & Trr
- P0512: Phase B, C And D Of Payload Verification Testing Trr
- P0515: (Ptp) Un-Vented Rate Of Temperature Rise With Guardtank Full
- P0524C: (Ptp) Rotate Payload And Position To Horizontal Procedure
- P0540D: Payload Verification Ii (Ptp) Ecu Checkout
- P0542B: (Ptp) Final Flux Flush Procedure
- P0547: (Ptp) Ultra-High Vacuum Bakeout Procedure
- P0559B: (Ptp) Probe C Pump-Out Procedure
- P0570: Manual Flux Flush
- P0575: (Ptp) Trapped Flux Measurement Procedure
- P0579: Determine The Thermal Resistance Of Probe C Window/Hex Units
- P0582C: (Ptp) Sia Flux Flush
- P0594: (Ptp) Smd Lift And Rotate 90 Degrees (Written By T. Welsh)
- P0595C: Reduce Liquid Level In Main Tank (Liquid At Nbp)
- P0613E: Repump Well W/Probe Installed
- P0617: Gp-B Mission Operations Center, Simulation Sim#1
- P0618: (Ptp) Remove Probe Spinup Gas/Vac Lines (+Z Axiz Up)
- P0627B: (Ptp) Install Gse Gas/Vac. Lines (-Y Axis Up)
- P0633C: (Ptp) Upright Smd (Rotate From Horizontal To Vertical Orientation)
- P0648E: Normal Boiling Point Main Tank Fill - Guard Tank Initially Depleted
- P0649: (Ptp) Probe Pressure Measurement System Removal
- P0650B: (Ptp) Pressurize Well To One Atmosphere With Probe Installed
- P0661: Venting Probe C With Lockheed'S Derby Attached To Top Hat
- P0669B: Gp-B Procedure For Sm Dewar: Internal Guard Tank Fill - Vent Lines Disconnected
- P0671: Pressurizing Probe C With Lockheed'S Derby Attached To Tophat
- P0672: Connect Main Tank Vent Line To Gas Module - Main Tank Subatmospheric
- P0673: Disconnect Main Tank Vent Line From Gas Module - Main Tank Subatmospheric
- P0674B: Connect Main Tank Vent Line To Gas Module 0-Main Tank At Nbp
- P0675B: Disconnect Main Tank Vent Line To Gas Module - Main Tank At Nbp
- P0676B: Connect Guard Tank Vent Line To Gas Module
- P0677C: Disconnect Guard Tank Vent Line From Gas Module
- P0712: V5 To Check Vatterfly Valve Grease Locking Effect
- P0719: Reduce Liquid Level In Main Tank (Liquid Subatmospheric)
- P0720: Initial Inspection Of Sia After Vacuum Can Removal
- P0729: Bottom-To-Top Particle Checks On Probe C Exhaust Line
- P0764: Gse Spinup Gas Cerfification
- P0775C: Certification Of The Tm&A
- P0776: Prepare Dewar For Transport
- P0777B: Configure Payload For Acoustic Test
- P0788: Configure Payload For Transport Following Acoustic Test
- P0789: Connect Tm&A To Smd
- P0790: Disconnect Tm&A From Smd
- P0793C: Configure Smd For Cryo Ops Following Transport
- P0794: Empty The Guard Tank - Drain To Mt
- P0795B: Install Line Burst Disk On Smd
- P0797: Regulate Guard Tank Pressure
- P0798: Main Tank Subatmospheric Fill From Nbp Supply Dewar-Gt Precool
- P0799C: Prepare And Verify Probe For Shipment
- P0800B: Configure Payload For Cargo Operations After Acoustic Test
- P0801: Guard Tank Pressurization For Transport
- P0823: Install Fill Line Relief Assembly On Smd
- P0831B: Prepare Main Tank For Launch
- P0834: Mock Thruster Vent Pallet Installation And Leak Check
- P0835: (Ptp) Ecu Temporry Installation Including Cables Gp-B Payload Verification Test Ii Operations Order
- P0840: (Ptp) Unvented Rate Of Rise Of Main Tank With Gas In Well
- P0841: (Ptp) Smd Flow Meter Calibrtion
- P0842: (Ptp) Heat Pulse Meter Verification Test
- P0860: Ac Shielding Test Procedure
- P0862: (Ptp) Dewar Lifetime And Thermal Data Acquisition Procedure
- P0869: (Ptp) Magnetometer Removal
- P0872: Low Temperature Bakeout Pressure Verification
- P0873: Configure Payload For Transport To Lockheed
- P0874B: Check Guard Tank Vent Line Impedance And Eliminate Blockage
- P0875: Gp-B Maintenance And Testing At All Facilities
- P0885: Configure Payload For Transport To Building 159
- P0891: Guard Tank Vent Line Impedence
- P0894: Installation Of Fee Guard Tank Vent Line And Leak Check
- P0906: Off-Site Monitoring Of Dewar
- P0916: Installation Of Fee Guard Tank Vent Line And Leak Check With Sv Vertical
- P0945: Install Gma Plumbing On Space Vehicle
- P0951: Disconnect Gse From Gma/Space Vehicle
- P0952C: Smd Prepare Payload For Thermal Vacuum Test
- P0955: Gma Preparation For Space Vehicle Thermal-Vac Testing
- P0957: Inspect And Reconfigure Payload Following Thermal Vacuum Test
- P0958B: Repressurize Guard Tank In Thermal Vacuum Test
- P0966: Pump Probe With Vac Module
- P0967: Stop Pumping With Vac Module
- P0972B: Scrub Launch Recovery Procedure For The Gma
- P0975: Prepare Payload For Mass/Cg Measurements Nd Condition Payload During Spin Balance Test
- P0984: Measuring Probe Pressure With The P9 Gauge
- P0986: Procedure To Support Space Vehicle Rav Test
- P0990: Installation And Testing Of The Guard Tank Thrust Nullifier
- P1000B: (Vandenberg) Prepare For Cryo Ops Following Transport To B1610
- P1001C: (Vandenberg) Prepare Main Tank For Launch
- P1002B: Configure Smd For Transport To Slc-2W
- P1003C: Prepare Smd For Launch
- P1004: (Vandenberg) Connect Main Tank Vent Line To Gas Module -- Main Tank Subatmospheric
- P1005B: (Vandenberg) Disconnect Main Tank Vent Line From Gas Module -- Main Tank Subatmospheric
- P1006: (Vandenberg) Connect Main Tank Vent Line To Gas Module -- Main Tank At Nbp
- P1007: (Vandenberg) Disconnect Main Tank Vent Line From Gas Module -- Main Tank At Nbp
- P1008: (Vandenberg) Connect Guard Tank Vent Lines To Gas Module
- P1009: (Vandenberg) Disconnect Guard Tank Vent Line From Gas Module
- P1010: (Vandenberg) Disconnect Electrical Gse From Payload
- P1011: (Vandenberg) Connect Tm&A To Smd
- P1012: (Vandenberg) Disconnect Tm&A To Smd
- P1013: (Vandenberg) Connect Electrical Gse To Payload
- P1014: (Vandenberg) Verify Helium Cylinder Content/Connect Helium Suppy Line
- P1015: (Vandenberg) Connect Vacuum Module / Pump On Smd Vacuum Shell
- P1016: (Vandenberg) Stop Pumping On Smd Vacuum Shell / Disconnect Vacuum Module
- P1017: (Vandenberg) Repump Well With Uts
- P1019: Discontinue Pumping On Probe-C With Uts
- P1026: (Vandenberg) Internal Guard Tank Fill -- Vent Lines Disconnected
- P1027B: (Vandenberg 1610) External Guard Tank Fill -- Main Tank Subatmospheric
- P1028C: (Vandenberg Mst) External Guard Tank Fill -- Main Tank Subatmospheric
- P1029: (Vandenberg) Internal Guard Tank Fill -- Guard Tank Vent Line Connected
- P1030: Guard Tank Liquid Level Reduction
- P1031: Main Tank Normal Boiling Point Fill With Pre-Cool From Main Tank
- P1032: (Vandenberg) Main Tank Fill With Guard Tank Precool -- Main Tank At Nbp
- P1033: (Vandenberg) Reduce Liquid Level In Main Tank -- Liquid At Nbp
- P1034: (Vandenberg) Nbp Main Tank Fill -- Guard Tank Initially Depleted And Connected To Gas Module
- P1035: (Vandenberg) Reduce Liquid Level In Main Tank (Liquid Subatmospheric)
- P1036B: Main Tank Subatmospheric Fill From Nbp Supply Dewar -- Guard Tank Precool
- P1037: (Vandenberg) Abbreviated Science Mission Dewar Functional
- P1038: Measure Guard Tank Vent Line Impedance
- P1039: (Vandenberg) Check Guard Tank Vent Line Impedance And Eliminate Blockage
- P1040: Transfer Liquid Helium From 1000 Gallon Storage Container Into 500/1000 Liter Supply Dewar
- P1041: (Vandenberg) External Guard Tank Fill -- Main Tank At Nbp
- P1042B: Guard Tank Recycle On Mst
- P1043: Pressurize Main Tank From Subatmospheric To Normal Boiling Point
- P1052D: External Guard Tank Fill -- Main Tank Subatmospheric And No Vent Lines Connected
Telescope
- P0151: Detector Package Fortelescope Assembly Procedure (See Procedures Broken Down Into Sections 151.1-12
- P0200D: Bonding The Telescope To The Quartz Block
- P0219: Telescope Detector Circuit Assembly
- P0220: Integration Of Science Telescope And Telescope Test Probe
- P0221: Integration Of Telescope Test Probe And Test Dewar With Artificial Star #2
- P0222: Science Telescope And Artificial Star #2 Alignment
- P0223: Artificial Star #2 Servo Alignment
- P0224: Artificial Star #2 Wide Field Scan
- P0225: Science Telescope Wide Field Scan Measurements At Room Temperature
- P0226: Artificial Star #2 Narrow Field Scan
- P0227: Science Telescope Narrow Field Scan Measurements At Room Temperature
- P0228: Artificial Star #2 Focal Scan Procedure
- P0229: Science Telescope Field Of View Scans
- P0230: Science Telescope Fine Scans
- P0231: Science Telescope Room Temperature Saturation Range
- P0232: Science Telescope Room Temperature Perpendicularity Of Readout Axes
- P0233: Science Telescope Room Temperature Linearity Test
- P0234: Science Telescope Cool Down
- P0235: Science Telescope Wide Field Scans, 4 K
- P0252: Cryo Focal Position Measurement Of Science Telescope For Cryo Focal Test
- P0253: Deintegration Of Science Telescope And Telescope Test Probe After Cryo Focal Test
- P0258: Science Telescope Test Readiness Review
- P0259: Bonding Telescope To Quartz Block Readiness Review Completion Certificate
- P0260B: Telescope Readout Electronics Test Readiness Review Completion Certificate
- P0261: Detector Packageassembly Test Readiness Review Completion Certificate
- P0266: Detector Package Assembly Integration With Telescope Procedure
- P0282: Gp-B Telescope Ida General Alignment And Bonding Procedures
- P0283: Gp-B Telescope Ida, Set Up Ida Assembly Fixtures
- P0284: Gp-B Telescope Ida,Alignchannelb Plate With Laser
- P0285: Gp-B Telescope Ida, Position Channel B Roof Splitter On Channel B Plate
- P0286: Gp-B Telescope Ida, Positionchannelbreflectors On Channel B Plate
- P0287: Gp-B Telescope Ida, Position Image Divider Housing On Channel B Plate
- P0288: Gp-B Telesope Ida, Position Beamsplitter On Beamsplitter Holder
- P0289: Gp-B Telescope Ida, Align Channel A Plate With Laser
- P0290: Gp-B Telescope Ida, Position Beamsplitter Assembly On Channel A Plate
- P0291: Gp-B Telescope Ida, Position Channel A Roof Splitter On Channel A Plate
- P0292: Gp-B Telescope Ida, Position Channel A Reflectors On Channel A Plate
- P0293: Gp-B Telescope Ida, Position Image Divider Housing/Channel B Assembly On Channel A Plate
- P0294: Gp-B Telescope Ida, Position Left And Right Relay Lenses On Ida Channel B
- P0295: Gp-B Telescope Ida, Position Left And Right Relay Lenseson Ida Channel A
- P0303: Gp-B Telescope Ida, Position Ida Pad On Ida
- P0332: Incoming Inspection And Testing Procedure For Flight Rev D Tre Circuit On Sapphire Carrier
- P0336: Position Ida On Telescope
- P0338: Gp-B Telescope "Position Detector Reflectors On Telescope"
- P0341: Gp-B Telescope "Position Clamp Supports On Telescope"
- P0347: Artificial Star 3 Test
- P0354: Operations Supplement For The Comparison Autocollimator, D600
- P0357: Procedure For Dpa Esd Precaution
- P0359: Procedure For Gp-B Science Telescope Transmission Measurement
- P0361: Base Plate/Tertiary Mirror/Primary Mirror Assy And Corrector Plate/Secondary Mirror Assy
- P0362: Qualification Strength Testing Of Bonded Telescope Parts
- P0364: Gp-B Telescope "Determine Metering Tube Length"
- P0365: Full Functional Test Procedure For Fwd Tre Units
- P0373: Position Reticle Plate On Telescope
- P0374: Bonding Meterining Tube To Baseplate Sub-Assy
- P0375: Bonding Forward Plate Sub-Assy To Metering Tube
- P0391: Help For Using The Tre Support Systems (Gse Testracks) Simplified Instructions
- P0392: Detector Package Assy (Dpa Acceptance Test Procedure)
- P0394: Transfer The Quartz Block/Telescope Assembly From The X-Y Cart To The Roller Mechanism Cart
- P0395: Transfer The Quartz Block/Telescope/Roller Mechanism Unit From The Roller Mechanism Cart To The Opti
- P0396: Quality Assurance Test Procedure For Telescope Readout Electronics (Tre) Ground Support Equipment Ra
- P0397: Gp-B Telescope "Transportation Of Telescope Between Clean Room Facilities"
- P0398: Gp-B Telescope "Removal Of Particulate Contamination From Telescope"
- P0408B: Telescope Readout Electronics (Tre) Detector Module Assembly (Dma) Connector Savers And Standardizer
- P0416: Detector Package Assembly (Dpa) Vibration Qualification Test
- P0439B: Gp-B Procedure For Sanity Check Of The St Field-Of-View
- P0444B: Detector Mount Assembly Repair Procedure
- P0445: Telescope Measure Reticle
- P0447: Inserting Shim
- P0450: Measurement Of Telescope Transmission
- P0451: Installation Of Dpa And Cleancan
- P0454: Measurement Of Telescope Field Of View
- P0456: Gp-B Telescope Load Testing Of Fixturing Used For Bonding The Telescope To The Quartz Block
- P0458B: Procedure For Staking Detector Package Assembly Components
- P0474: Connecting Dpa And Tre Electrnics To Flight Probe
- P0485B: (Ptp) Procedure For Post-Inspertion Impedance Testin Of Tre Detectors
- P0487B: (Ptp) Procedure For Tre Aliveness Test Following Payload Insertion
- P0488B: (Ptp)Procedure For Tre/Dma Temperature Control Verification
- P0489: (Ptp) Procedure For Tre Nominal Function Test
- P0490B: (Ptp) Procedure For Tre Random Noise Data Collection
- P0500B: (Ptp) Articicial Star #3 Installation Procedure
- P0501B: (Ptp) As3 Telescope Alignment Procedure
- P0502C: (Ptp) Artificial Star 3 Transmisibility And Acquisition Range Tests Of Telescope
- P0503D: (Ptp) Artificial Star 3 Focus, Scale Factor, And Strehl Ratio Tests Of Telescope
- P0504B: (Ptp) As3 Removal Procedure
- P0541B: (Ptp) Tre Installation Including Cables
- P0555B: (Ptp) Telescope Telemetry And Optical Power Setup Procedure
- P0573: (Ptp) Tre Temperature Stability Test Procedure
- P0629B: (Ptp) Tre Box Removal
- P0753C: Tre Detector Stimulus Test
- P0822: Tre Software Checkout Procedure
- P0871: Procedure For Tre Heater Operations