WEEKLY HIGHLIGHTS FOR WEEK ENDING 5 OCTOBER 2001:
SUCCESSFULLY COMPLETED PRIMARY SV FIT CHECK
The GP-B team successfully completed the initial fit check and measurements of the Integrated Payload and Spacecraft Aft Truss in LM B/205. The Payload
was removed from the Tilt Dolly, translated above the Spacecraft Aft Truss, and lowered into the truss to check for any cable harness and MGSE
interferences. The Payload was then lifted and placed back the the Tilt Dolly.
Photo: