WEEKLY HIGHLIGHTS FOR WEEK ENDING 5 JULY 2002:
SPACE VEHICLE INTEGRATION AND TEST CONTINUES
A dry run of the B side full functional test was run during the past week. Thruster flow tests, FEE cable routing,
and cable bracket fit checks were performed. The dewar well was evacuated to reduce the heat load into the main tank.
Photo: None available this week.