WEEKLY HIGHLIGHTS FOR WEEK ENDING 17 SEPTEMBER 1999:
STANFORD HIGHLIGHT
All four of the flight gyroscopes were levitated and slowly spun. Each
gyroscope levitated cleanly on every levitation attempt. The measured spin
down rate for each gyroscope met requirement. These excellent results
indicate that the gyroscopes are physically clean and of high quality, and
that the gyroscopes are consistent with the flight need. The gyroscope
team members involved in this work include Rob Brumely, Paul Bayer, Bill
Bencze, Bruce Clarke, Chris Gray, and, David Hipkins.
Photo: Two prototype gyro rotors, one before and one after niobium coating applied,
and one half of a gyroscope rotor housing.
Large Photo (click small to view): The life and times of a gyro assembly...
SPACE VEHICLE HIGHLIGHT
A new 3-ft. diameter vacuum chamber, complete with hot/cold wall and
digital video cameras for real-time release monitoring and test
documentation has been assembled in B/255 for GP-B Relativity Mission
mechanism testing.
Photo: LMMS engineer Mark Molini with the new vacuum chamber preparing to test
the ARP Launch Restraint Mechanism (ALRM) engineering unit.