WEEKLY HIGHLIGHTS FOR WEEK ENDING 26 June 1998:
STANFORD HIGHLIGHT
The first payload-electronics board has been completed and
delivered to GP-B
by the manufacturer. This board contains
the digital portion of the
Telescope Readout System (TRE)
led by Paul Ehrensberger and Bob Farley.
This validates the
management- and build-plan for flight boards.
SPACE VEHICLE HIGHLIGHT
The Relativity Mission Spacecraft Power Distribution Unit
(PDU) Final Data
Review was successfully performed at Spectrum
Astro Inc. in Gilbert, Arizona
on Friday, June 19. The PDU was
transported by LMMS Quality Assurance to
LMMS building 251 in
Palo Alto, California. The unit is currently in locked
bonded
stores and will soon be integrated onto the space vehicle structure.